Energy storage for your needs
96+%
More revenue from your battery storage system
0€
Upfront investment
15+ years
Saving from your battery
The energy challenges facing your business
Grid connection limits
Your business is growing, but your grid connection isn't. Adding capacity requires costly upgrades and long waiting periods that can delay expansion plans.
Battery investment barriers
Buying a battery system requires €70,000+ upfront, plus technical expertise to operate and optimize. The payback period is uncertain and the technology risk is yours.
Unpredictable peak charges
A single 15-minute consumption spike can add thousands of euros to your annual energy bill. These capacity charges are determined by your highest peak—even if it only happens once.
Two paths to energy independence
Choose the ReVolta Battery-as-a-Service solution that fits your business need
Most popular
Joint Valorisation Partnership
Perfect for businesses with adequate grid connections who want to reduce energy costs.
- Fixed monthly revenue
- Lifetime partnership for your battery with full service support
- Buy your battery early if you choose to
How It Works
- We finance & install the complete battery system at your site
- We generate energy savings and revenue from helping the electricity grid during hours you don't need the battery
- You can access the battery for your own technical needs
- You can purchase the battery after 6 years time at a residual value
Your Benefits
- Save on your energy bills from day one
- Zero upfront investment—we handle all CapEx
- Protection from unpredictable peak charges
- AI-powered optimization included
- 24/7 monitoring & maintenance by ReVolta
Ideal for:
- Manufacturing facilities
- Cold storage & food processing
- Commercial buildings
- Data centers
- 100+ kW grid connection
Grid Upgrade Alternative
Grid Constraint Solution
Avoid expensive grid upgrades while expanding your operations.
Custom pricing
- Based on your capacity needs • Flexible terms
The Challenge
You're hitting your grid connection limit and need more capacity. Traditional upgrades cost €30,000-200,000+ and take 12-48 months. We offer a faster, cheaper alternative.
How It Works
- We assess your needs and design a battery system sized to your growth plans
-
Battery provides capacity during peak periods, acting as "virtual grid upgrade"
- Your battery saves on your energy contract from day one
- Installed in 4-8 weeks vs. 12-48 months for grid upgrade
-
Flexible terms based on your specific capacity requirements
Your Benefits
- Avoid €30,000-200,000 grid upgrade costs
- Expand operations immediately, not in 48 months
- Save on your energy bills from day one
- Scalable solution grows with your business
- No long-term commitment to oversized grid connection
Ideal for:
- Manufacturing facilities
- Cold storage & food processing
- Commercial buildings
- Data centers
- 100+ kW grid connection
Our process in four steps
1
Discovery
Share 12 months of energy bills. We analyse your consumption patterns, peak charges, and grid connection capacity to determine fit.
2
Site Assessment
We evaluate your site for space, grid connection, load profiles, and optimal battery sizing. Full technical feasibility report provided.
3
Custom proposal
Receive detailed savings projections, battery specifications, usage windows, and contract terms tailored to your business needs.
4
Installation & Go-Live
We handle permitting, installation, commissioning, and optimization. You start saving money within weeks of contract signing.
ReVolta vs traditional approaches
Feature | ReVolta partnership | Buying Battery Outright | Grid Upgrade | Do nothing |
Upfront Investment | €0 | €400,000+ | €30,000-200,000 | €0 |
Time to Savings | 12-24 weeks |
12-24 weeks | 12-48 months | Never |
Technical Expertise Required | ✗ We handle everything | ✓ Need in-house team | ✗ Grid operator handles | N/A |
Peak Charge Protection | ✓ | ✓ | ✗ | ✗ |
Grid Capacity Expansion | ✓ Virtual expansion | ✓ If configured | ✓ Physical expansion |
✗ |
24/7 Monitoring & Maintenance | ✓ Included | ✗ Your responsibility | N/A |
✗ |
Battery Performance Risk | ✗ We assume risk | ✓ You assume risk | N/A | N/A |
15-Year Total Cost (ex. for a 700kW/1.500kWh battery system in France)* | €531,900 in shared revenue & savings = €531,900 net gain | €335,000 upfront +€45.000 in maintenance
= €117,700 net gain | €50,000-100,000 No operational savings = Net cost | €0 upfront No operational savings |
- * Numbers may vary for, among others, size of the battery, initial investment cost, energy tariffs, grid connection availability. Ask us for a detailed simulation.
- ** Considering case where customer has a local generation surplus that is valorized by ReVolta stacked with grid services and smart peak shaving, vs valorized by his own battery, or injected in the grid
Ready to Reduce Your Energy Costs?
Get a free feasibility assessment and custom savings projection for your business. No obligation, no cost—just clarity on how much you could save.

Do you need help with your energy storage or energy flexibility project?
Our experts may be able to help you.