Energy storage for your needs
2x faster payback
More revenue from your battery storage system
0€
Upfront investment
15+ years
Saving from your battery
The energy challenges facing your business
Grid connection limits
Your business is growing, but your grid connection isn't. Adding capacity requires costly upgrades and long waiting periods that can delay expansion plans.
Battery investment barriers
Buying a battery system requires €70,000+ upfront, plus technical expertise to operate and optimize. The payback period is uncertain and the technology risk is yours.
Unpredictable peak charges
A single 15-minute consumption spike can add thousands of euros to your annual energy bill. These capacity charges are determined by your highest peak—even if it only happens once.
ReVolta vs traditional approaches
Feature | ReVolta partnership | Buying Battery Outright | Grid Upgrade | Do nothing |
Upfront Investment | €0 | €400,000+ | €30,000-200,000 | €0 |
Time to Savings | 12-24 weeks |
12-24 weeks | 12-48 months | Never |
Technical Expertise Required | ✗ We handle everything | ✓ Need in-house team | ✗ Grid operator handles | N/A |
Peak Charge Protection | ✓ | ✓ | ✗ | ✗ |
Grid Capacity Expansion | ✓ Virtual expansion | ✓ If configured | ✓ Physical expansion |
✗ |
24/7 Monitoring & Maintenance | ✓ Included | ✗ Your responsibility | N/A |
✗ |
Battery Performance Risk | ✗ We assume risk | ✓ You assume risk | N/A | N/A |
15-Year Total Cost (ex. for a 700kW/1.500kWh battery system in France)* | €531,900 in shared revenue & savings = €531,900 net gain | €335,000 upfront +€45.000 in maintenance
= €117,700 net gain | €50,000-100,000 No operational savings = Net cost | €0 upfront No operational savings |
- * Numbers may vary for, among others, size of the battery, initial investment cost, energy tariffs, grid connection availability. Ask us for a detailed simulation.
- ** Considering case where customer has a local generation surplus that is valorized by ReVolta stacked with grid services and smart peak shaving, vs valorized by his own battery, or injected in the grid
Two paths to energy independence
Choose the ReVolta Battery-as-a-Service solution that fits your business need
RV Centrale
Zero investment, Zero risk.
Zero investment
ReVolta finances your battery storage system.
Zero risk
Only benefit from the upside. We take the risks.
Zero hustle
We install, monitor, optimize so you don't have to.
RV Agile
Grid Upgrade Alternative
Up in weeks, not years
License to operate without constraints from your grid connection.
Zero CAPEX
Finance your battery through our leasing partners.
Ready for the future
Save on your contract, don't get caught in the next energy crisis.
Our process in four steps
1
Discovery
Share 12 months of energy bills. We analyse your consumption patterns, peak charges, and grid connection capacity to determine fit.
2
Site Assessment
We evaluate your site for space, grid connection, load profiles, and optimal battery sizing. Full technical feasibility report provided.
3
Custom proposal
Receive detailed savings projections, battery specifications, usage windows, and contract terms tailored to your business needs.
4
Installation & Go-Live
We handle permitting, installation, commissioning, and optimization. You start saving money within weeks of contract signing.
Ready to Reduce Your Energy Costs?
Get a free feasibility assessment and custom savings projection for your business. No obligation, no cost—just clarity on how much you could save.

Do you need help with your energy storage or energy flexibility project?
Our experts may be able to help you.